i3 Engineering and Consulting LLC .
Utility Inspector
September 2014 — December 2014
Over see all inspection on a 2.5 mile 10 inch and 3 inch pipe line from one well pad to another . Inspect and supervise over the 1650 foot HDD for the 3 and 10 inch bores , and a 90 foot conventional bore. The gas company was Gastar Exploration company. Reference's upon request.