Close Close Preview

Your amazing online presence is right this way.

Create your profile
Capture who you are, what you do, and where you're going. All in one place.

Jared Dick

Jared Dick

Consultant

Held Enloe & Associates, LLC

Consultant at Held Enloe & Associates, LLC

Message
MENU ☰

Held Enloe & Associates, LLC

Consultant

• Analyzed impact of large scale accidents and delays on major commercial and infrastructure construction projects
• Structured dynamic financial models of Builder’s Risk insurance claims to evaluate scope of loss despite ongoing work
• Conducted forensic cost and schedule analysis of recovery work done in order to precisely define impact of delay
• Estimated various methods of post-delay construction in order to determine most cost effective means of work acceleration
• Broke down construction claims into definable elements substantiated by produced documentation
• Prepared analysis narrative for clients use in both advisory and litigious engagements

Career medium 01
Career
Career medium 06

Kiewit

Field Engineer

• Reduced construction costs by $40,000 by instituting innovative design changes to existing engineering blueprints
• Enabled piping installation to begin 6 months ahead of schedule by developing a "plan the plan" engineering path
• Created operation specific construction plans that rigidly enforced standards but could evolve given changing conditions
• Performed construction work 10% under budget by continuously anticipating possible unforeseen obstacles
• Monitored daily construction costs and progress in order to accurately track performance of operation in real time
• Synthesized engineering drawings from separate firms into clear and comprehensive field guide for union workers

Career

Kiewit

Field Engineer

• Oversaw installation of all piping systems of Air Quality Control System project at Brayton Point Power Plant.
• Developed innovative installation method and reduced labor cost by 75% for pipe support construction.
• Administrated multiple material and engineering contracts worth in excess of 2.5 million dollars
• Continuously reviewed aspects of construction process in order to develop more efficient methods of installation.

Career medium 06
Career
Career medium 04

FlexLink

Project Engineering Co-Op

• Worked directly under senior project engineer during the design, review, and manufacture of automation systems
• Selected to be the Full Project Engineer for small projects given discretion to make purchase and design decisions
• Engaged with customers to ascertain specifications and tolerance parameters, as well as to explain design
• Managed multiple projects simultaneously with different budgets, specifications, and deadlines
• Developed unique solutions to problems specific to each new customer and conveyor system

Career

Lehigh University

Bachelor of Science (B.S.), Mechanical Engineering

Phillips Exeter Academy

High School