Close Close Preview

Your amazing online presence is right this way.

Create your profile
Capture who you are, what you do, and where you're going. All in one place.

Fadi Bandak, PMP

Fadi Bandak, PMP

Head of planning and control department

Ouais Group Engineering and Contracting

Head of planning and control department at Ouais Group Engineering and Contracting

Message
MENU ☰

Ouais Group Engineering and Contracting

Head of planning and control department

 Managing a team of engineers and Data Analysts for the purpose of controlling cost and updating plan progress
 Collecting data from site , engineers and QC for updating the Quantity Survey in order to incorporate progress data into the reports
 Project budget estimating , planning and preparation
 Follow-up Schedule updates , proactively communicate issues
 Proof-reading contracts and method statements
 Control the Personnel and Equipment on board through daily reports
 Forecasting the material requirements and communicating them to procurement department.
 Issuing and controlling subcontractors activities progress and duly prepare the bills
 Determine deviations from the projected plan and implement corrective measures
 Archiving and Communicating lessons learned

Career medium 02
Career
Career medium 06

Coolrich district cooling llc

Project engineer

Read-proof contracts and method statements
Prepare Project Charters , help cost estimation
Mobilize , procure required materials
Work-around possible risks and constraints
Pre-commissioning the Chilled water cooling system by:
doing the required air-test (if required)
doing the required hydrotest
using the suitable chemicals to get the desired water quality
Observe the performance of the workers and report
Manage and control the variations that could happen to the scope and discuss daily with the people in charge
Communicate properly the daily issues and log them
Doing field test for the chemicals , and other parameters to assure efficiency
Measure variance from the planned schedule and try to fix.

Career

Belhasa Biotek Solutions

Production Supervisor

 Managing a team of engineers and workers for the delivery of different orders in correct and timely manner
 Optimizing the efficiency of the production line by continuous monitoring of all the variables and parameters
 Coordination with Maintenance and QA departments for the smooth functioning of plant operation
 Taking initiative and relevant preliminary actions in emergencies
 Providing necessary inputs and analysis of incident stoppages to reduce the downtime
 Ensure compliance of all policies and procedures including Health & Safety standards

Career medium 01
Career
Career medium 06

Maritime Industrial Services Co. Ltd. Inc

MIS

an oil and gas services company , specialized in oil and gas metal fabrication services and man-power supply , serving in the uae for more than 30 years , doing projects like cross country pip-lines , bunkering facilities , pressure vessels , barges , FPSO , FSO and so many others

Career

Maritime Industrial Services Co. Ltd. Inc

MIS

 Supervision of fabrication team and man-hour allocation
 Analysis of (Approved For Construction) drawings , MTO’s(Material Taking Off), cut list, netting diagram shop drawing prior to fabrication
 Coordination with project management team, planning and engineering to raise PCR’s(Production Change Request)
 Working with procurement & warehouse for new material delivery & release
 Delivering different constructional projects as per customers requirement on time.

Career medium 02
Career
Career medium 03

Maritime Industrial services company

Production Engineer (Structural)

Supervised Fabrication team & allocated man-hour to team
Analyzed AFC (Approved For Construction) drawing, MTO's(Material Taking Off), cut list, netting diagram Shop drawing prior to Fabrication
Coordinated with PMT, Planning & ENGG. and raised PCR's(Production Change Order) for the additional work requested by client
Coordinated with Procurement & Warehouse for new material delivery & release
Controlled material issuance & traceability for production and returned balance material to warehouse
Coordinated with quality control for WPS (Welding Procedure Summary), ITP's(Inspection & Test Plan), Spec's issuance.
Reviewed Fabrication Sequence, Method Statement, WPS & Rigging Studies and modified if required
Ran regular production meeting with production team to achieve the client requirements, project specifications, productivity and project schedule
Prepared the daily/ weekly progress report & daily/weekly production status report and two weeks look ahead plan
Suggested and implemented ideas that promote the quality of production, improve delivery, and better serve clients requirements and goals
Prepared the close out report for the completed projects for management
Prepared As Built Drawings and submitted to quality control for approval
Site surveillance for quality and sort out shop daily problems.
Assisted proposal department for estimating the budget man-hours
Prepared the hydro test procedures and ordered hydro test packages
Prepared the load out notification and packing list for the completed projects
Reviewed the thickness measurement report prepared by Quality Control Team for the repairing works and supervised team to identify and mark the corroded area for which to be renewed

Career

Jami'at Al-Ulum wa Al-Tiknolojia Al-Urdunia

BS, Chemical Engineering

National Orthodox School

General Certificate of Secondary Eductaion, Tawjihi