Capitol Consultants
1st Class Insulator
July 2006 — September 2009
I did duct work and boiler room work onboard carrier bush at Northrup Grumman Newport News, made pads and installed , installed and rip-out, a lot of patch work, ran chill water pipes, installed in the overhead, used fiberglass tape, installed duct and clothed it, installed wool in a variety of spaces on ship until contract was finished.