Close Close Preview

Your amazing online presence is right this way.

Create your profile
Capture who you are, what you do, and where you're going. All in one place.

Bharat Gupta

Bharat Gupta

Engineering Supervisor

Radisson Blu sohar

Sultanate of Oman, om

I am writing to express my interest for the job in Engineering. Currently working with Radisson BLU hotel Sohar as Engineering Supervisor since December 2015 having 179 hotel rooms and outlets, I had lead the department in the absence of Manager Engineering in my previous property. I had been part of the pre-opening and ...

Message
MENU ☰

Radisson Blu sohar

Engineering Supervisor

Involve in Handover from Projects, MEP and civil snagging, done some Project related work,
Involve in making the collaterals, engineering plants handovers, modification of guest room and Plant room defects,
Successful modified the swimming pool, Boiler feed water system, Grey water treatment plant, Guest room modification like card reader faulty , Guest room main door lock, RMS system , installed the fire alarm transponders .
Preventive maintenance of following Machinery
1.5 Ton vertical coil fire operated steam Boiler make Fulton and 4 X 56 Kw (2500 liters) ICI Cladiae steam to water exchanged clarifier with 76 kW heat recovery system by plate heat exchanger.
2 X 5000 liters Titanium anode protected Gas Tanks with 126 liters/hr =65 kg/hr consumption gas tank with 2 X 40 kg/hr vaporizer,
17 no FAHU make McQuay with heat recovery system, 1260 l/s to 5000 l/s, McQuay operated FCUs,
BMS by DELTA,
1040 ton refrigeration system by McQuay with 2X 380 and 1 X 440 ton chiller.
Fire alarm system by Esser with 544 smoke and 46 heat detectors, self-operated emergency and exit lights
400 +500 GPM Firefighting system by Naffco, Josylem, Fire Drive, National with 1335 Tyco sprinklers,
Gas leak detection system,
Electrolux Industrial refrigerators and kitchen equipment, Bravilor Boilers, La Pavoni coffee machines, Brema Ice machines, Sammic, Sigma Taura Machine for the Butchery and Vegetable Preparation area, with Guentner Cold room and Bitzers Compressors.
Laundry machines 3 X 35 washing machine, 3 X 35 dryer, Camptel pressing machines and 315 kg Atlas Copco evaporated air compressors.
180 KL grey water treatment plant.
4982 Kw connected load, 4237 MW maximum demand and 6 no. oil transformer with off load tap changer.
500 Kw emergency generator for the emergency load, 30 Kw emergency UPS by APC.
680 KL swimming pool with 170 kW heated and 113 kW cooling units, 4 X 78 m3/h flow rate pumps to operate .